Meidura: 43 deploys. Review held about 20.
43deploys
20held by review
0rolled back
Sign-in and a double-billing fix went to production. None of the 43 deploys were rolled back.
The sprint ran from the afternoon of October 1 into the next morning. What landed included Microsoft and Apple sign-in, a fix for charging an evaluation twice, and the rules on forms and comments.
Review held about 20 before they shipped. The worst were mature comments shown to the wrong staff, a filename check that did not cover the repo, and a publish that claimed success before the rule had run.